Stone going up and Floor going down...

We got to stop in and check on things happening inside with our project manager Greg...
Stone was completed Dec 29, 2014

A peek at the vinyl floor walking into the entry/foyer.

Wood laminate floor under the cardboard that is in great room, study and kitchen/morning room area.

Laundry room closet...I have a pinterest idea! Hope it turns out:)

Worker in the study...I see the french doors, yea!

Kitchen...still just sort there. Hoping to peek at cabinets, but not yet!

More wood laminate to peek at.

Morning room

Beginnings of tile flooring going down in master bath today!

Master bath in progress

Sunday, December 21, 2014

Some inside pics


Foyer with tray ceiling...leads into great room with fireplace straight ahead

Kitchen...ummm...sorta...lol!

Morning Room

Morning Room patio doors

Siding Complete and a sneak peek inside...

Today I brought Zoey to the home site so she could check things out too...Robert was on the road on his way back from visiting his parents and family:)
Here are some pics of what we saw!

Zoey "christening" the house...


Wednesday, December 17, 2014

Pre Drywall Meeting

December 16, 2014 8am
We showed up at house site to meet with our project manager John, but instead we were surprised by a NEW project manager Greg.
He introduced himself and explained he would be taking over for John on our house as the project manager. He is new with Ryan Homes but has 20 years custom build experience.
John arrived shortly after introductions and let us know he would still be around as well to help Greg ease into the Ryan Homes way...
So Greg took the lead on our meeting and walked us thru every room of the house explaining and answering questions as we went. He was very professional and thorough and we appreciated it.
His timeline is to begin siding (which was delivered and is sitting outside the house)...on Wednesday December 17th. He said it would take 2-3 days to complete the siding.
Wednesday morning when I drive by before work he was sitting outside our house in his truck waiting for City inspector to meet him for an inspection so he can move forward to begin drywall.
He did say his estimated date for our closing looks to be January 21, 2015.
He will firm that up with us Friday in an email.

Tuesday, December 9, 2014

Inside Work coming along...

A lot going on inside now! Plumbing, rough electrical, hvac work...all the preliminary work. We had our meeting last week with our Guardian rep to select where the speakers in the basement will be wired, as well as smoke detectors, etc...it was our first official visit inside the construction phase of our home:)
Our basement floor has been poured.
Our garage floor will be poured sometime this week.
Then the insulation will be installed. At that point we should be getting a call from John our Project Manager to have our pre-drywall meeting at the house.

Wednesday, November 26, 2014

Saturday, November 22, 2014

Wrapped like a Chipotle burrito!

Wow, what a difference a day makes! The temperature was above 40 today and we had a lot of sun, Snow is melting and the builders are making the most of it...this is the progress they made on Saturday and we went by around 3pm...so they must have been up early and working!


Front door is open! Come on in!



Back of house


Friday, November 21, 2014

Walls without floors...

The framing has started and I can see where rooms/windows are going, very neat!


November 21, 2014 Lunchtime


November 21, 2014 7:30am


Tuesday, November 18, 2014

WINTER has arrived:(

November 17, 2014 we had our first significant snow storm, brought 5 inches to us. Followed by an artic blast of frigid air, wind chills in the negative.
Since our concrete for garage and basement did not get poured before this wintery blast, we are on Plan B...


From: "Evans, John" <jevans@nvrinc.com>
Date: November 18, 2014 at 8:41:12 AM EST
To: Robert H Hill II <treborrh1171@gmail.com>
Subject: Re: questions
We are going to do the framing first then pour the concrete in the basement and the garage.  It makes it a little better with the recent weather events.  Also the windows and doors will not be affected by the elements. They are designed to withstand these conditions.
Thanks
John

Thursday, November 13, 2014

We Got Wood:)

Seriously...our lumber has arrived! I ran into John, our project manager when I was cruising thru on my lunch break...no I do not stalk the place, just drive by and smile:):):):)
Anyway...John said they will start framing next week.


Wednesday, October 29, 2014

Dig Day!

Well, it is here!!!!
Drove by on lunch today, October 29, 2014 and they are digging! Yippie! I hope when they find the treasure they call us right away!


Tuesday, October 28, 2014

Interior Paint decison

While we have the time....sitting in our apartment....we are trying to select items we will be moving forward with once we close on our house...like interior colors!
Here is the neutral palette we have selected...



Chandelier for our morning room...:)




Thursday, October 23, 2014

Flags, stakes and pins...oh my!!

Drove by our site this morning on my way to work and they have it all staked out!
 
October 28, 2014
 

I see electric cables...they are getting ready:)
 
 

Saturday, October 4, 2014

Pre-Construction Meeting scheduled for October 15, 2014

Today we met our Project Manager who will be building our house, John. He began by going over all our selections, going thru the house  room by room discussing layout and options.
He marked where we want our pre- wires (study, morning room and guest bedroom).
We learned that whole house oil rubbed bronze does NOT include shower rods...interesting huh?
So I think that might look " off" but we can deal with that later, not a major deal, just surprised me.
We learned our driveway, sidewalks, exterior trim painting and sod/landscape will all be completed in spring, so we go thru winter with packed gravel for our driveway.
Pros and cons, he did say a fresh concrete driveway can't withstand the weight of a moving truck, so we won't have to worry about our POD as it will sit on gravel:)
Should be a joy watching Zoey endlessly search for a perfect spot to do her business when there will be no grass anywhere!
Our trim work package was outlined for us, it will be in the foyer, tray ceiling and study. Just crown molding and trimming on non doorways.
Confirmed garage bump, total footage should be 21' roughly.
Talked about ceilings, they only come stomped, but looked nice, so we are good with that.
Asked him to omit installation of wire shelf in laundry room, he admitted there would be a 50/50 chance his guys would be able to follow that change, but he will make it right should they forget...they work like robotic machines and don't deviate:)
We flipped the option on the light fixtures at foyer and entrance to house, placing the more ornate fixture up in the tray ceiling.
Found a place for the 110 outlet in basement.
House will have 150 amp electric service.
Water heater is electric, they say for the efficiency, but we would have preferred gas.
Learned our cabinets ARE indeed 42"  (very happy), this is now standard for Ryan Homes.
The timeline we were told at this point is:
October 29/30... Breaking Ground! He will call us to let us know but joked not to come out at 6am to watch (he has people do that)!
He estimated drywall would go up approximately 30 days after ground breaking.
He estimated a potential closing date of late January...we told him to take his time, we are committed to our apt lease until end of March.
But there are a few things we want to do before moving in and winter in Ohio...well you just never know!
We are excited and look forward to working with John and seeing our house be built!

Tuesday, September 30, 2014

Approved!

We just got the news that all is well and we are approved with NVR mortgage. They kept a great timeline with us on documents needed and met their goal of 28 days to respond:)
All went smooth!

Sunday, September 21, 2014

Rite Rug flooring appointment September 19, 2014


Here are our picks:)
Kitchen cabinets, laminate counter top and LVT flooring in study, kitchen, great room and morning room.


Standard vinyl flooring in foyer, mud room and 2 bathrooms.

Standard vinyl flooring with espresso cabinets that will be in all the bathrooms.

Upgraded carpet for bedrooms and basement, and padding. Carpet name is "Sweet Tea", we took it as a sign:) lol

Master bath will have the alternate shower and ceramic tile flooring, with the espresso cabinets.

Hoping this looks as awesome as we think it will with all the bronze finishes!