A lot going on inside now! Plumbing, rough electrical, hvac work...all the preliminary work. We had our meeting last week with our Guardian rep to select where the speakers in the basement will be wired, as well as smoke detectors, etc...it was our first official visit inside the construction phase of our home:)
Our basement floor has been poured.
Our garage floor will be poured sometime this week.
Then the insulation will be installed. At that point we should be getting a call from John our Project Manager to have our pre-drywall meeting at the house.